DarkFEST Build Progress continues. The dump trucks are rolling, and monster machines are shaping the lips. The signature step up is in place, giant hip is ready to run, and the 90 footer leads into the twisty wizard. Not too long until top to bottom test runs will start.
Share the Stoke!